33MW photovoltaic power station project in Alxa League

 

Project name: 33MW photovoltaic power station project in Alxa League, Inner Mongolia

 

Project owner: Alxa League Shenghui Energy Technology Co., Ltd.
Role of our company: EPC
Project introduction: The installed capacity of photovoltaic power station project in Alxa League, Inner Mongolia is 33MW, which was commenced in April 2013, and its grid connection was conducted on November 20, 2013.
235Wp polycrystalline silicon and 260Wp monocrystalline silicon photovoltaic modules and fixed and adjustable photovoltaic support are selected for the project, with the fixed method of fixing the bored concrete pile foundation to the ground. The average annual electricity production is estimated to be 43 million kilowatt-hours and the project can save 15,000 tons of standard coal, reduce 40,000 tons of carbon dioxide emission and 300 tons of sulfur dioxide each year.
                          

 